Adams Elementary School
Eugene, OR
- As of 5:57pm
-
PowerOutput4,915.0 W
-
Irradiance854.0 W/m2
-
TemperatureCell96.4°FAmbient67.1°F
- Lifetime
-
4,124.0 kWhlbs of CO2 Avoided
Weather
67 °F/19 °C
Partly Cloudy at 4:52 pm PDT
Wind direction:
Wind speed: 7 mph
System Specs
System Installer
-
The Green Store
This week, Adams Elementary School generated Kilowatt-hours of electricity.From fossil-fueled sources, this amount of electricity would have emitted lbs of CO2 into the atmosphere.
This could power:
- An electric toothbrush for
- A 42" plasma-screen television for
- A typical video game system for
In October 2011, Adams Elementary School installed a 6.44 kW through a grant from Eugene Water & Electric Board, which was awarded based on a vote of the utility's Greenpower customers. BEF has provided data monitoring, a kiosk, educational materials and teacher training. The installation of this system makes Adams the first school in the Eugene 4J School District to have a renewable energy system.
New Projects
News
-
4/1
-
3/1
-
1/10
-
10/27
-
10/5
-
6/7
-
4/20
-
3/28
-
3/9
-
6/15

