Adams Elementary School

Eugene, OR
  • As of 3:20am PDT
  • Power
    Output
    23.0 W
  • Irradiance
    0.0 W/m2
  • Temperature
    Cell
    54.5°F
    Ambient
    56.8°F
  • Lifetime
  • 25,199.0 kWh
    35,278.6 lbs of CO2 Avoided

Weather

Overcast at 2:53am
62 °F/17 °C
Overcast at 2:53am
Wind direction: E
Wind speed: 5 mph

System Specs

  • 6.44kW System Size
  • (1) Fronius IG Plus 6.0 Inverter
  • (28) Grape CS-P-230-DJ 230W Modules
  • Tilt: 30.0°
  • Orientation: 180.0°
Learn about Equipment Specs

System Installer

  • The Green Store
This week, Adams Elementary School generated Kilowatt-hours of electricity.From fossil-fueled sources, this amount of electricity would have emitted lbs of CO2 into the atmosphere.

This could power:

  • An electric toothbrush for
  • A 42" plasma-screen television for
  • A typical video game system for

In October 2011, Adams Elementary School installed a 6.44 kW through a grant from Eugene Water & Electric Board, which was awarded based on a vote of the utility's Greenpower customers. BEF has provided data monitoring, a kiosk, educational materials and teacher training. The installation of this system makes Adams the first school in the Eugene 4J School District to have a renewable energy system.