Bandon City Offices
- As of 4:03am PDT
-
PowerOutputW
-
IrradianceW/m2
-
TemperatureCell°FAmbient°F
- Lifetime
-
kWhlbs of CO2 Avoided
System Specs
- 30 Solar World 250W Modules
- 30 M215 Enphase Micro-Inverters
- ChargePoint Level I/II EV Charging Station
- DECK Monitoring - Inverter Production
- DECK Monitoring - EV Charging Demand Load
System Installer
-
Americorp Construction
-
Sol Coast Consulting & Design
This week, Bandon City Offices generated Kilowatt-hours of electricity.From fossil-fueled sources, this amount of electricity would have emitted lbs of CO2 into the atmosphere.
This could power:
- An electric toothbrush for
- A 42" plasma-screen television for
- A typical video game system for
The City of Bandon installed this 7.5kW solar power generation system on a covered parking structure at the city offices. Both the energy produced by this array and the energy consumed by nearby electric vehicle charging stations are monitored and displayed here and at a kiosk at the utility offices. This project underscores the city's commitment to sustainability.
New Projects
News
-
6/14
-
4/1
-
3/1
-
1/10
-
10/27
-
10/5
-
6/7
-
4/20
-
3/28
-
3/9