City of Ashland - Shakespeare Festival Admin Bldg
Ashland, OR
- As of 5:33pm
-
PowerOutput185.1 w
-
IrradianceN/A
-
TemperatureCellN/AAmbientN/A
- Lifetime
-
14,749.8 kwh20,649.7 lbs of CO2 Avoided
Weather
53 °F/12 °C
Cloudy at 1:52 pm PST
Wind direction:
Wind speed: 0 mph
System Specs
System Installer
&NBSP
Today, City of Ashland - Shakespeare Festival Admin Bldg generated 3.5 Kilowatt-hours of electricity. From
fossil-fueled sources, this amount of electricity would have emitted 4.9 lbs of
CO2 into the atmosphere.
This could power:
- An electric toothbrush for 13 weeks
- A 42" plasma-screen television for 6 hours
- A typical video game system for 1 week
Solar Ashland was BEF's first renewable energy project, its first community solar project, and at the time it began operating, the largest solar power plant in the Pacific Northwest. The project was a collaborative effort by the City of Ashland, BEF, BPA, the State of Oregon, and Avista Energy, along with the citizens of Ashland who subscribed to the project, and two local solar hosts: Southern Oregon University and the Oregon Shakespeare Festival.
New Projects
News
-
1/20
-
1/10
-
10/27
-
10/5
-
6/7
-
4/20
-
3/28
-
3/9
-
6/15
-
6/11

