Clark Columbia Vista (BEF)
Vancouver, WA
- Right Now
-
PowerOutput1,426 w
-
IrradianceN/A
-
TemperatureCellN/AAmbientN/A
- Lifetime
-
19,724 kwh27,613 lbs of CO2 Avoided
Weather
67 °F/19 °C
Fair at 8:53 pm PDT
Wind direction: NW
Wind speed: 6 mph
System Specs
System Installer
-
Dynalectric
&NBSP
Today, Clark Columbia Vista (BEF) generated 6 Kilowatt-hours of electricity. From
fossil-fueled sources, this amount of electricity would have emitted 8 lbs of
CO2 into the atmosphere.
This could power:
- An electric toothbrush for 22 weeks
- A 42" plasma-screen television for 11 hours
- A typical video game system for 1 week
The 2.1-kW roof-mounted PV installation at Columbia Vista provides power to the Company’s mill. This demonstration project is a direct result of the success of Clark Public Utilities' (CPU) green power program, Green Lights. The solar electric system was funded by revenues from this voluntary program, which allows utility customers to purchase non-polluting, renewable energy supplied by BEF.
New Projects
News
-
6/15
-
6/11
-
5/20
-
5/20
-
5/18
-
5/18
-
5/5
-
4/14
-
3/30
-
3/30

